Sims, J. R.
Improve evaluation of brittle-fracture resistance for vessels
Gas Processing/LNG
/ Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Gas to liquids (GTL)
/ Heat Transfer
/ Management
/ Middle East
/ Safety
This article discusses a new approach and spreadsheet tool for engineers that can be used to provide operating pressure limits as a function of vessel-metal temperatures.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Acetyls and Sandpiper Chemicals announce $1.7-B, 1.1-MMtpy low-carbon methanol project in Texas (U.S.) 4/29
- Envision joins AEA Ammonia Certification System pilot to accelerate global clean ammonia trade 4/29
- BASF and Nutrien collaborate on expanding access to low-carbon biofuel markets 4/29
- India proposes rules to allow higher ethanol-blended fuels in vehicles 4/29
- Indian refiners' March crude processing slips 1.8% from a year earlier 4/29
- Sinopec refinery utilization drops, but chemical exports rise due to Iran war 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

