Saha, J.
Jhuma Saha is a Process Engineer with Bechtel India. She has 16 yr of process engineering experience in petroleum refining and petrochemicals front-end engineering and detailed design. Prior to joining Bechtel India, she worked with Fluor, Foster Wheeler and Linde. She holds an MS degree in chemical engineering from Jadavpur University in India.
Aromatic complex: A case study for relief load estimation of a heat integrated refinery unit
Refineries are moving from fuels to chemical production as the demand for fuel derived from crude oil declines in the near future.
Estimation of relief load and realistic relieving temperature for heavy-end fractionating columns
Relief calculation is one of the most discussed aspects of chemical engineering design.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- DOMO Chemicals responds to surging demand in China with its new TECHNYL polyamide production plant 4/29
- Ineos shuts down Canadian unit for maintenance after chemical leak 4/29
- India's Chennai Petroleum sees two-year delay in building new 180,000-bpd refinery 4/29
- PetroChina profit boosted by stronger gas sales and fuel demand 4/29
- thyssenkrupp Uhde completes EnviNOx project for Dyno Nobel in Australia 4/29
- India receives fuel oil cargo in Russian SCF tanker after brief halt 4/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction