Aronen, R.
Amine pumps upgraded for improved operations and reliability
Asia/Pacific
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Carbon Management
/ Economics
/ Engineering & Design
/ Loss Prevention
/ Pumps
/ Rotating Equipment
/ Safety
A gas processing plant in Malaysia eliminated a source of expensive failures in its acid gas removal unit (AGRU).
Improve pump reliability with advanced composite wear rings
The results were reduced vibration and seal leaks at this plant
Improving equipment reliability through e-learning
It will change the way people work, learn, communicate and solve problems
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF introduces first superabsorbent polymer with product carbon footprint of zero 2/7
- Russia may ban gasoline exports for a month to stabilize prices 2/7
- South Korean petrochemical firms' profits fall in 2024 as oversupply persists 2/7
- Russia's oil transit via Ukraine down 15% in 2024 2/7
- Amogy expands operations to South Korea, strengthening regional presence with key stakeholders to advance its ammonia-to-power solutions 2/7
- U.S. refiner Delek could run more light sweet oil if tariffs bite, CEO says 2/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction