Walker, B. A.
Facility siting—balancing risk vs. cost
Companies should take a second look at identifying and analyzing hazards associated with temporary buildings
Optimum console design promotes control room efficiency
New features can enhance traditional functionality, reduce operating costs and foster worker safety
Challenges in control room design
Use these guidelines to reduce shiftwork fatigue and increase operator awareness+
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- From corn fields to cargo ships, ethanol gains early traction as marine fuel 6/12
- Indonesia raises price of widely used fuel by 32%, adds to cost-of-living concerns 6/12
- Technip Energies, Safran, Airbus, Tereos to form green jet fuel venture in France 6/12
- Saipem awarded €900-MM gas compression plant project in Saudi Arabia 6/12
- Trans Mountain pipeline in Canada hits full capacity two years after upgrade 6/12
- MB Energy and Zaffra sign MoU to advance commercialization of eSAF in Europe 6/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

