Eskandarlu, A.
a mechanical engineering graduate from Azad University, has been actively involved in the area of rotating and packaged equipment engineering since 2005. Since he joined Chagalesh Consulting Engineers in 2008, he has been engaged in many hydrocarbon processing projects as a machinery lead engineer. He holds a head position in the machinery department of Chagalesh and is also an instructor of pump and compressor courses.
Compare pitot tube pumps with high-speed centrifugal pumps for low-flow applications
When seeking a pump for a low-flow, high-head application, there is a temptation to choose a high-speed (HS) integral gear-driven centrifugal pump because of its advantages over multi-stage centrifugal and other types of pumps.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras signs on with Baker Hughes for sweeping gas turbines service agreement 3/18
- TwinThread launches Perfect Batch, an AI-powered analytics solution to optimize batch production 3/18
- bp to block union workers from Whiting refinery 3/18
- Analysis: Licocene Terra, using renewable carbon in hot melt polymers for adhesive formulations 3/18
- Ionautics finds breakthrough in iridium-based porous catalyst layer technology for green hydrogen production 3/18
- thyssenkrupp nucera supplies electrolyzers for Moeve’s green hydrogen project 3/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

