Dixit, P.
Pramod Dixit works as a freelance consultant operating from Baroda, India. He provides informative lectures and training to engineers working in engineering, operations, inspection and maintenance groups of process plants and engineering companies. He has more than 44 yr of experience working at different positions in Indian companies, including Engineers India Ltd., L&T-Chiyoda Baroda, and ESSAR Offshore and Subsea Ltd. in greenfield and brownfield projects. He earned a BTech degree (mechanical) from IIT Roorkee India.
Project Management: Check installation of the tray column before box-up
To push the project schedule, plant owners sometimes proceed the boxing up of columns without approval of the tray designer.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

