Ashfaq Anwer
Ashfaq Anwer is an Inspection Professional with 15 yr of experience in ammonia-urea complexes, petrochemical units, and oil and gas industries. He has extensive expertise in material selection, corrosion mapping and control, fitness-for-service studies, defining inspection framework and implementing inspection plans for old and new units.
Preventive maintenance checks and optimization
In the hydrocarbon processing industry (HPI), if preventive maintenance is being performed and does not result in some insight related to the performance of the equipment or system, then that preventive maintenance is either not required or is being incorrectly directed.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Michelin, IFPEN and Axens announce successful progress in BioButterflyâ„¢ R&D project to produce biobased butadiene from bioethanol 12/11
- UPM launches the first bio-based, NIR-detectable, carbon-negative pigment for premium packaging 12/11
- Five mega-trends reshaping the global energy and resources landscape in 2025 12/11
- RCI, nova-Institut unveil new carbon label for products, intermediates and raw materials 12/11
- SK Energy secures in-house access to feedstock to create Korea's first vertical integration for waste plastics recycling 12/11
- Petronet LNG secures loan for 750,000-tpy PDH/PP project in India 12/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

