Poussin, G.
Guillaume Poussin is the Group Managing Director at CREALYST-Group. He has more than 15 yr of experience in the study and development of technologies concerning particle behavior during filling processes of cylindrical vessels for different applications (e.g., for catalysts and adsorbents and the agricultural storage of grain).
Solving maldistribution: Catalyst loading and why it matters
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Catalysts
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Reactors
/ Americas
/ Europe
Are your reactor yields lower than forecast? Does your fixed-bed catalytic reactor suffer from hotspots?
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- DOMO Chemicals responds to surging demand in China with its new TECHNYL polyamide production plant 4/29
- Ineos shuts down Canadian unit for maintenance after chemical leak 4/29
- India's Chennai Petroleum sees two-year delay in building new 180,000-bpd refinery 4/29
- PetroChina profit boosted by stronger gas sales and fuel demand 4/29
- thyssenkrupp Uhde completes EnviNOx project for Dyno Nobel in Australia 4/29
- India receives fuel oil cargo in Russian SCF tanker after brief halt 4/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction