Younas, J.
Jabran Younas is the Senior Inspection Supervisor at EFERT. He has more than 17 yr of hands-on experience in the field of non-destructive testing and inspection of plant static equipment. He holds various API , ASNT and NCNDT certifications and has worked in different fertilizer and petrochemical units in Pakistan and the Middle East as a Senior Inspection Supervisor.
Aging pressure relief valves: Are you managing history well?
The risks associated with the malfunction or blockage of pressure safety valves (PSVs) are significant, and operating facilities invest heavily in preventive maintenance (PM) programs to mitigate the risks and ensure that PSVs are functioning exactly as per design requirements.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Vertex Energy pauses renewable diesel output to switch back to fossil fuels, citing macroeconomic woes 5/10
- Citgo Petroleum reports Q1 profit of $410 MM 5/10
- Golden Pass LNG in discussions with contractor, may delay startup 5/10
- SAFFiRE Renewables biofuel pilot plant to be developed in Kansas 5/10
- EBRD backs Ukraine's green biofuels project with €60-MM loan 5/10
- Russia's refined oil product exports to Singapore to hit highest this year in May 5/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction