Consider practical conditions for vacuum unit modeling
A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Improve design strategies for refinery vacuum towers
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Increase distillation capacity with side heaters and coolers
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Rethink placement of preflash drum in crude preheat train network
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Solving hydraulic problems in crude preheat train networks
Heat transfer and hydraulic problems need to be considered simultaneously
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OMV and XRG complete transactions to create Borouge International, boosting global chemicals leadership 3/31
- Gevo announces major ethanol expansion project at North Dakota (U.S.) facility 3/31
- BASF and Avery Dennison collaborate to launch BASF’s newest acrylates based on renewable electricity: Butyl acrylate RE and 2-Ethylhexyl acrylate RE 3/31
- INPEX extends MoU with Persero for Abadi LNG project in Indonesia 3/31
- Russian oil tanker enters anchorage of Cuba's Matanzas port 3/31
- China's smaller independent refiners to curb output on rising oil prices 3/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction