Saraf, S.
HP Viewpoint: Forecast for process safety in the 21st century
The 20th century was a time of great technological change. Such changes that have forever altered how we live and work. The 1970s brought the creation of the US Environmental Protection Agency and the..
Biodiesel: A feedstock quandary
Life cycle costs will affect feedstock selection for renewable fuels
HPIn LNG: Risk within reason
US liquefied natural gas (LNG) import terminal projects have met with considerable opposition from local communities. A major debate surrounds the hazards and societal risks/benefits from LNG faciliti..
HPIn LNG: Shipping natural gas – new frontiers
Global natural gas (NG) demand is expected to double by 2020. Result: There is an increased activity in NG exploration. Globally, 75% of the NG produced is transported through pipelines, and the remai..
Understanding LNG rapid phase transitions
This basic knowledge can help mitigate potential hazards
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

