Ceary, P. J.
Philip Ceary graduated from the University of Maryland College Park with a BS degree in chemical engineering in May 2002. He works in the field of process design, optimization and logistics, and project development for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design—Part 2
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Distillation
/ Drivers
/ Engineering & Design
/ Environment
/ Equipment
/ People
/ Products
/ Safety
/ Valves
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sealmatic partners with Saudi Thalate in Saudi Arabia 10/14
- Colonial Oil Industries Marine Division achieves ISCC Plus and EU certifications 10/14
- Fulkrum diversifies its service portfolio with new offerings 10/14
- Kinaxis, ExxonMobil partner to transform energy sector supply chains 10/14
- Phillips 66 agrees to sell interest in Switzerland-based joint venture 10/14
- Nigeria signs deal to supply gas to proposed $3.5-B petrochemical plant 10/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction