Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages

- thyssenkrupp Uhde successfully commissions EnviNOx® emission reduction system for Covestro’s NAUCI project in China 5/12
- Univation Technologies announces world-scale 800,000-tpy design capacity for UNIPOL™ PE process technology 5/12
- Traders rebrand Venezuelan oil for China as Brazilian 5/12
- British bioethanol industry faces 'existential' threat after U.S. trade deal, producers say 5/12
- Copersucar revenue to grow by $1.5 B after Eco-Energy deal with Green Plains 5/12
- As Brazilian president visits China, $1-B SAF deal announced 5/12