Frenk, B.
Evaluate pressure relief system forces in existing installations
The purpose of this study is to limit the number of relief valves that require rigorous engineering calculations to determine the adequacy of the installation.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indonesia expects EU to adjust palm oil biofuel stance after EU ruling 1/17
- First-ever ammonia and propane co-loaded vessel completes voyage from U.S. to Europe 1/17
- China's vast refining sector faces shakeout as fuel demand peaks 1/17
- Oman Oil Marketing Co. and TFG Marine establish bunker fuel supply JV 1/17
- Beware Egypt's smokestack onshoring as cement exports surge 1/17
- Petrobras reports record high refinery output in 2024 1/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction