Hancock, J. M.
Jessica M. Hancock joined Nalco Champion in 2009, and is currently a global marketing manager. She provides technical support for petrochemical plant process treatment programs, and stewards the development and launch of innovative treatment programs into the petrochemical industry. Dr. Hancock holds a PhD in chemistry from the University of Washington in the US.
A chemist’s perspective on organic fouling in ethylene operations: update
Ethylene manufacturing is a continuous race to be commercially competitive in a volatile global market.
A chemist’s perspective on organic fouling in ethylene operations
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Corrosion
/ Drivers
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Polymers
/ Rotating Equipment
Since organic fouling cannot be completely eliminated, ethylene producers must use operational, chemical and mechanical methods to minimize heat transfer losses and equipment downtime.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

