Perissé, J. B.
Replan: Modernizing Brazil’s largest crude oil refinery
Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Biofuels
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Management
/ Middle East
/ Naphtha
/ Octane
/ Reactors
/ Safety
/ Treating
The project included installing two hydrodesulfurization (HDS) units for the cracked naphtha produced by two catalytic cracking units, a coker naphtha hydrotreating (HDT) unit, and a catalytic reforming unit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Hanwha Ocean signs strategic MoU with Kanata Clean Power for proposed $15.7-B, 12-MMtpy FLNG project in Canada 6/18
- Burckhardt Compression secures milestone order for first industrial scale liquefied CO₂ carrier supporting Northern Lights CCS project 6/18
- Dynelectro dispatches 250-kW electrolyzer unit to Syntholene’s Iceland eSAF project 6/18
- EIA: U.S. crude inventories decline for tenth week to over 40-yr low 6/18
- Australia opens first carbon refinery, making new products from captured CO2 6/18
- ABB expands non-invasive sensing portfolio to advance simpler, safer temperature measurement 6/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

