DeBaecke, J.
Understanding and maintaining an effective lubrication system
Follow these guidelines to improve gearing equipment life
Improve cooling tower gear drive reliability
Applying commodity products instead of engineered solutions can cause premature failure
Returning submerged gear drives to temporary service
Follow these guidelines to render the unit operational for a significant period before a rebuild is required
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Acetyls and Sandpiper Chemicals announce $1.7-B, 1.1-MMtpy low-carbon methanol project in Texas (U.S.) 4/29
- Envision joins AEA Ammonia Certification System pilot to accelerate global clean ammonia trade 4/29
- BASF and Nutrien collaborate on expanding access to low-carbon biofuel markets 4/29
- India proposes rules to allow higher ethanol-blended fuels in vehicles 4/29
- Indian refiners' March crude processing slips 1.8% from a year earlier 4/29
- Sinopec refinery utilization drops, but chemical exports rise due to Iran war 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

