Klussmann, B.
Bert Klussmann is Chief Technologist at Rigby Refining. He has more than 20 yr of process design and technology development experience. Mr. Klussmann has designed, built, started up, operated and managed proprietary hydrodesulfurization technologies, as well as other refining process solutions. He has also managed the process engineering department for a major technology licensor. Mr. Klussmann earned a BS degree in chemical engineering from Texas A&M University.
A solution to the IMO 2020 MARPOL Annex VI requirement
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Desulfurization
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrocracking
/ Hydrotreating
/ Reactors
/ Sulfur
/ Treating
On January 1, 2020, a new requirement limiting the sulfur content of marine fuel to a maximum of 0.5 wt% went into effect.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Axens builds on ExxonMobil MTBE Decomposition Tech for high purity isobutylene production 6/7
- thyssenkrupp Uhde awarded supply of new uhde ammonia converter cartridge including synthesis catalyst by İGSAŞ 6/7
- Leak halts unit at Shell's Pernis oil refinery in Rotterdam 6/7
- Germany triggers EU investigation into Chinese biofuels 6/7
- Russian oil supplies to EU via southern Druzhba to rise 16% in June 6/7
- Aramco, ENI, United Airlines invest in UK-based low-carbon fuel venture 6/7
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction