Prodan, R.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Indonesia expects EU to adjust palm oil biofuel stance after EU ruling 1/17
- First-ever ammonia and propane co-loaded vessel completes voyage from U.S. to Europe 1/17
- China's vast refining sector faces shakeout as fuel demand peaks 1/17
- Oman Oil Marketing Co. and TFG Marine establish bunker fuel supply JV 1/17
- Beware Egypt's smokestack onshoring as cement exports surge 1/17
- Petrobras reports record high refinery output in 2024 1/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction