Al Turiki, A.
Abdullah Al Turiki is a Khurais Producing Department Technical Advisor with more than 15 yr of experience in rotating equipment. He joined the company as a machinist and then focused on rotating equipment after joining the reliability unit as a technical advisor. His experience includes troubleshooting, condition monitoring and leading reliability programs. The author can be reached at Abdulah.turiki@aramco.com.
High-pressure gas compressor dry gas seal system enhancement case study
The Khurais producing department (KhPD) consists of four oil trains: each oil train is responsible for receiving, stabilizing and purifying the crude oil from the wells by removing sand, water, gas and hydrogen sulfide (H2S) contents to make the oil ready for use and shipment to refineries.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- PyroGenesis announces completion of coke-oven gas valorization and H2 production project for Tata Steel 7/15
- New protein-based system enables plastic recycling with reusable enzymes 7/15
- CF Industries starts Donaldsonville (U.S.) Complex CO2 dehydration and compression unit, permanent CO2 sequestration 7/15
- Emerson introduces GenAI-enabled automation for power and water industries 7/15
- Trump's sanctions threat looms over Russian oil exports to China, India and Turkey 7/15
- China state refiners ramp up output on rising demand, stock rebuild 7/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction