Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- SAFFiRE Renewables breaks ground on SAF pilot plant in Kansas (U.S.) 9/20
- ABP awards CONSER tech licensing contract for 50,000-tpy maleic anhydride plant in Oman 9/20
- Technip Energies and KBR selected for a major LNG project by Lake Charles LNG 9/20
- UPM Biochemicals and Södra accelerate the commercialization of innovative lignin-based solutions 9/20
- LanzaTech signs MLA with SEKISUI to develop multiple commercial-scale waste-to-ethanol plants across Japan 9/20
- Twelve announces $645 MM in funding to transform CO2 into jet fuel and electrochemicals at scale 9/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction