Gajadhar, S.
Stephen Gajadhar is a Facilities Planning Specialist at Saudi Aramco, leading techno-economic feasibility studies and conceptual engineering of refining and chemicals projects. He is a chartered chemical engineer with 26 yr of experience in the oil and gas industry. He earned Bch and MS degrees in engineering from the University of the West Indies, St. Augustine, Trinidad & Tobago.
Advanced hydrocracking unit flow scheme optimization and integration approach to maximize refinery margins for a residue upgrading project
Environment & Safety
/ Process Optimization
/ Refining
/ Catalysts
/ Crude oil
/ Desulfurization
/ Diesel
/ Engineering & Design
/ Environment
/ Gasoline
/ Hydrotreating
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Middle East
The integration of a solvent deasphalting and hydrocracking upgrading complex provides a favorable techno-economic return for residue upgradation at relatively lower capital expenditures vs. other alternatives for a brownfield project.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Hanwha Ocean signs strategic MoU with Kanata Clean Power for proposed $15.7-B, 12-MMtpy FLNG project in Canada 6/18
- Burckhardt Compression secures milestone order for first industrial scale liquefied CO₂ carrier supporting Northern Lights CCS project 6/18
- Dynelectro dispatches 250-kW electrolyzer unit to Syntholene’s Iceland eSAF project 6/18
- EIA: U.S. crude inventories decline for tenth week to over 40-yr low 6/18
- Australia opens first carbon refinery, making new products from captured CO2 6/18
- ABB expands non-invasive sensing portfolio to advance simpler, safer temperature measurement 6/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

