Gous, G.
Gustaf Gous works as a Process Control Consultant at Analyte Control. He graduated from the Department of Chemical Engineering, University of Pretoria, with a B-Eng degree in chemical engineering in 1987, followed by a B-Eng (Honors) and an M-Eng degree. He is now occupied with pursuing a PhD.
Integral vs. proportional gap for averaging level control
In process plants, many instances of level control are required to keep the material balance of the plant from integrating to undesired operating conditions.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Haldia Petrochemicals awards ethylene plant digitalization contract to Lummus 5/2
- INEOS completes purchase of LyondellBasell's EO&D facility in Bayport, Texas (U.S.) 5/2
- HPLNG delays commissioning of Chhara LNG import terminal in India 5/2
- Shell records nearly $8-B Q1 profit on the back of refining, chemicals/products and LNG divisions 5/2
- Water treatment specialist SurfCleaner supplies Norwegian energy giant Equinor 5/2
- U.S. White House: Russia shipping fuel to North Korea above UN cap 5/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction