Riley, C.
Targeted liquid injection improves shed deck performance
Process Optimization
/ Project Management
/ Refining
/ Americas
/ Asia/Pacific
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
This case study shows how the installation of an unique piping and lance design achieved targeted liquid injection, quenched vapor hot zones and reduced resid entrainment into the heavy coker gasoil product.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

