Singla, P. K.
Pankaj Kumar Singla works as a Senior Engineer at Worley in Al-Khobar, Saudi Arabia. He has more than 13 yr of experience in the detailed engineering of static equipment in the pre-bid phase, as well as front-end engineering design (FEED) and detailed engineering for various oil and gas, petroleum refining and petrochemical industry projects. Prior to joining Worley, Mr. Singla worked as a Static Equipment Engineer for Fluor Daniel India Pvt. Ltd., Daelim Industrial Co. (South Korea) and as a Senior Engineer at Valdel Engineers & Constructors (India). He holds a B. Tech degree from Punjab Technical University, India. The author can be reached at pankajsingla99@gmail.com.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Acetyls and Sandpiper Chemicals announce $1.7-B, 1.1-MMtpy low-carbon methanol project in Texas (U.S.) 4/29
- Envision joins AEA Ammonia Certification System pilot to accelerate global clean ammonia trade 4/29
- BASF and Nutrien collaborate on expanding access to low-carbon biofuel markets 4/29
- India proposes rules to allow higher ethanol-blended fuels in vehicles 4/29
- Indian refiners' March crude processing slips 1.8% from a year earlier 4/29
- Sinopec refinery utilization drops, but chemical exports rise due to Iran war 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

