![](/media/6851/hp_052018_engineering-and-construction_suplement.jpg)
Engineering and Construction
When ‘mega’ goes ‘GIGA’—A discussion on the Sadara petrochemical complex
After the Engineering Construction Contracting (ECC) association’s 2017 PerspECCtives conference, Ashraf Ayoub, part of the ECC’s board of directors, was able to sit down with Joseph Brewer, Chief Implementation Officer of Sadara, to exchange thoughts on the implementation of the $20-B Sadara petrochemical complex project.
Building for the future: An analysis of global capacity additions
Over the past several years, the world has witnessed significant capacity growth in all sectors of the downstream hydrocarbon processing industry (HPI). The majority of this growth has taken place in Asia-Pacific, the Middle East and the US
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction