Drivers
HP Reliability: Better equipment selection starts with understanding available upgrade options
Maintenance & Reliability
/ Americas
/ Asia/Pacific
/ Compressors
/ Drivers
/ Europe
/ Middle East
/ Motors
/ Pumps
/ Rotating Equipment
It all started with a letter we received from a major multinational petrochemical company: A reliability manager related that he had recently asked each maintenance department within the corporation&#..
Case 57: Troubleshooting the cause of sudden impacts
Maintenance & Reliability
/ Compressors
/ Drivers
/ Economics
/ Engineering & Design
/ Motors
/ Piping
/ Pumps
/ Rotating Equipment
/ Safety
Finding the cause can be elusive but calculations help
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

