Environment & Safety
Select the best protection method for electrical apparatus in hazardous areas
Here are the trade-offs between safety and cost-of-ownership
Calculating settle-out pressure in compressor loops
Simple procedure can be used to help determine piping and equipment design pressures into process loops
Issues and crisis communications management
For plant owners and operators, the right words and actions can make a meaningful difference
Avoid failures in waterside utility systems
Use these preventive steps to improve operations and reliability of process water treatment units
Optimize operations of demineralization units
Better selection of resins and operating practice improve operation of this water treatment method
Improve oily wastewater treatment
Innovative methods meet challenges to pretreat and dispose of process wastewater properly
Understand reverse osmosis as a vital water treatment
Normalizing plant data reveals true condition of membrane systems
HP Automation Safety: Required: competent personnel
The ANSI ISA 94.00.01-2004 (IEC 61511 Mod) standard has a clear statement about personnel competency. It says, "Persons, departments or organizations involved in safety life cycle activities shall be ..
Sarbanes-Oxley impacts plant personnel, too
This US regulatory act governing accounting policies also applies to process design and operations
HP Automation Safety: Fieldbus in safety applications
Many engineers remember the original ISA S84.01 safety standard of 1996, which stated, "As new technology evolves and becomes available (e.g., ISA SP50 Fieldbus), it will be addressed in future versio..
- Methanex to indefinitely idle 860,000-tpy Trinidad and Tobago methanol plant 6/30
- Several injured in fire at Haldia Petrochemicals' plant in eastern India 6/30
- Shell forecast: Global LNG demand expected to grow by 65% by 2050 6/30
- Neste to invest over €400 MM in Porvoo refinery maintenance turnaround 6/30
- Capstone Energy+ expands proven power solution at world's southernmost refinery with follow-on order in Chile 6/30
- XRG acquires upstream stake in Vaca Muerta to support the Argentina LNG project 6/29

