Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Heat Transfer

Foster Wheeler sending a steam reformer to Bashkortostan

Foster Wheeler AG’s Global Engineering and Construction Group has been awarded a contract by JSC Novo-Ufimsky refinery, a subsidiary of Russian oil company Bashneft, for the engineering and material supply of a new Terrace Wall steam reformer heater and air preheating system for the Ufa refinery in the Republic of Bashkortostan, Russia.

Titan Metal Fabricators adds new facilities in India

Titan Metal Fabricators has announced the opening of a wholly-owned production subsidiary in India. Known as Titan Metal Fabricators India, the new operation is Titan’s first expansion outside the US.

Alfa Laval wins SEK 75 million refinery order in Saudi Arabia

Alfa Laval has received an order for Alfa Laval Packinox heat exchangers to a refinery in Saudi Arabia. The order value is about SEK 75 million and delivery is scheduled for 2012.

Energy management toolkit available soon

The US Department of Energy’s Industrial Technologies Program (ITP) is in the process of developing the Energy Management Toolkit.

Improving pH control mitigates corrosion in crude units

Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections

Avoid brittle fracture in pressure vessels

Chagalesh Consulting Engineers: Khazrai, F.  |  Haghighi, H. B.  |  Kordabadi, H.

Key points identify effects from auto-refrigeration on steel vessels

Flare stack structure revamp: A case history

Reliance Industries Ltd.: Singh, S.

An innovative approach was used to repair an older flare structure online without an extensive shutdown

HP Water Management: Passivation in cooling water circuits

MarTech Systems, Inc.: Huchler, L. A.

Passivation—the formation of a corrosion-resistant oxide on a clean metal surface—is the key to optimizing system reliability on the waterside of heat exchangers. Most plant personnel are aw..

Addressing waste-heat-recovery in Alberta

Atlas Copco Gas and Process has received a multi-million dollar order for expander generators to be used in waste-heat-recovery. The machines, which are set for delivery in November 2011, will help produce electricity in Canada’s Alberta province.

Minimize carbon footprint from Claus tail-gas units

Linde AG: Heisel, M.
WorleyParsons: Rameshni, M.

Reevaluate emissions efficiencies on sulfur-removal operations