Information Systems
Economics of business process integration and automation
Where along the automated integration continuum should your plant be?
Automated steady-state identification in multivariable systems
Use this technique for better results and less computational burden
Improve nonlinear soft sensing modeling by combining multiple models
FMM-based methods are shown to give better results
Linking the plant floor to the enterprise: benefits and pitfalls
Understand data needs of business and production systems for better integration
Fieldbus introduces new concepts in process control
Devicebuses and sensorbuses complete the architecture
Fieldbus improves petrochemical plant operation
Reduced design, installation and startup costs provided significant benefits
Fieldbus automates oil production field
ARCO estimates savings of $621,000 per drill site
Foundation fieldbus helps meet regulatory and profitability challenges
The technology simplifies field-level communications and provides new functionality
Getting started with fieldbus – a primer
Use these guidelines to set up an experimental Foundation fieldbus system
Intrinsically-safe fieldbus provides chemical plant savings
Similar conventional and fieldbus installations are compared
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

