Information Systems
Expert systems aid plant operations managers
Actual plant examples show how this technology can solve problems and improve operations
Real-time optimization: an ''alternative approach''
Performing functions simultaneously can improve performance
Applying neural networks
Use these practical guidelines for successful applications
LP integrates economics into dynamic matrix control
This popular algorithm becomes cost conscious
Tips for control engineers
Use these guidelines to improve project success
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

