Octane
Operational improvements proposed at Pine Bend refinery
The projects are expected to improve reliability, reduce key emissions and improve the refinery's ability to convert crude oil into transportation fuels.
Consider new technologies to raise diesel yield in bottom-of-barrel products
The debate continues over adding a new delayed coker vs. a residue hydrocracker upstream of an existing delayed coker.
HP Viewpoint: Age of turbulence: Charting the refining course toward a profitable future
High-performing enterprises draw on external expertise during all project phases, from scouting and front-end engineering and development through to operations.
HP Impact: Natural gas vehicles could be gaining traction
Natural gas vehicles could be gaining tractionA new report from PIRA Energy Group says that the sheer volume of US recoverable gas resources relative to expected demand suggests that benchmark Henry H..
Redefining reforming catalyst performance: High selectivity and stability
Highly developed CCR catalysts are more robust to ensure extended service over 7–9 years.
Upgrade heavy oil more cost-efficiently
A new technology can economically upgrade and significantly improve the properties of heavy oil by reducing viscosity, increasing gravity and removing contaminants.
Increase FCC processing flexibility by improved catalyst recycling methods
The dynamic global refining market emphasizes the need for greater operating flexibility in the fluid catalytic cracking (FCC) unit.
HP Construction Profile: Texas-based refinery has a long history
The Valero Port Arthur Refinery was commissioned in 1901 and has had many process additions and improvements throughout its history (see pg. 38). In 2001, nearly $850 million was invested in a delayed..
Chevron crude unit at fire-hit California refinery may be out six months
Investigators reportedly found serious damage in the cooling towers, pipe racks and heater tower. Some of the refinery’s secondary units are continuing to operate using feedstock stored at the site, but no decision has been made on whether Chevron will buy additional feed or shut the units during repairs.
HP Insight: How long is an economic cycle for the HPI?
As summer takes hold in the Northern Hemisphere, demand for energy in various forms increases. In looking back over the past 90 years, energy demand and pricing cycle through high and low points. In 2..
![](/media/2s0ho4z2/hp-may-2024-biofuels-renewable-fuels.jpg?width=100)
- Chevron Lummus Global's ISOTERRA technology selected for SAF project in China 6/14
- Transform Materials and Johnson Matthey collaborate to enable lower carbon and mercury-free alternative routes for PVC manufacturing 6/14
- AMETEK Process Instruments releases WDG-V HP combustion analyzer for high-particulate applications 6/14
- Neste supplying SAF to Emirates for flights from Singapore Changi Airport 6/14
- Danfoss Drives, Honeywell agree to enhance collaboration to reduce downtime, lower engineering costs 6/14
- Huntsman inaugurates new innovation center in Belgium 6/14