Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Octane

Operational improvements proposed at Pine Bend refinery

The projects are expected to improve reliability, reduce key emissions and improve the refinery's ability to convert crude oil into transportation fuels.

Consider new technologies to raise diesel yield in bottom-of-barrel products

Axens: Morel, F.  |  Duddy, J.  |  Wisdom, L.

The debate continues over adding a new delayed coker vs. a residue hydrocracker upstream of an existing delayed coker.

HP Viewpoint: Age of turbulence: Charting the refining course toward a profitable future

Shell Global Solutions International BV: Ozmen, S. M.

High-performing enterprises draw on external expertise during all project phases, from scouting and front-end engineering and development through to operations.

HP Impact: Natural gas vehicles could be gaining traction

Hydrocarbon Processing Staff: Thinnes, Billy

Natural gas vehicles could be gaining tractionA new report from PIRA Energy Group says that the sheer volume of US recoverable gas resources relative to expected demand suggests that benchmark Henry H..

Redefining reforming catalyst performance: High selectivity and stability

Axens: Le Goff, P.-Y.  |  Lopez, J.
Axens North America: Ross, J.

Highly developed CCR catalysts are more robust to ensure extended service over 7–9 years.

Upgrade heavy oil more cost-efficiently

Ivanhoe Energy: Cabrera, C. A.  |  Silverman, M. A.

A new technology can economically upgrade and significantly improve the properties of heavy oil by reducing viscosity, increasing gravity and removing contaminants.

Increase FCC processing flexibility by improved catalyst recycling methods

UOP LLC, a Honeywell Company: Wolschlag, L. M.
UOP LLC, a Honeywell Co.: Lippmann, M.

The dynamic global refining market emphasizes the need for greater operating flexibility in the fluid catalytic cracking (FCC) unit.

HP Construction Profile: Texas-based refinery has a long history

Hydrocarbon Processing Staff: Romanow, Stephany

The Valero Port Arthur Refinery was commissioned in 1901 and has had many process additions and improvements throughout its history (see pg. 38). In 2001, nearly $850 million was invested in a delayed..

Chevron crude unit at fire-hit California refinery may be out six months

Investigators reportedly found serious damage in the cooling towers, pipe racks and heater tower. Some of the refinery’s secondary units are continuing to operate using feedstock stored at the site, but no decision has been made on whether Chevron will buy additional feed or shut the units during repairs.

HP Insight: How long is an economic cycle for the HPI?

Hydrocarbon Processing Staff: Romanow, Stephany

As summer takes hold in the Northern Hemisphere, demand for energy in various forms increases. In looking back over the past 90 years, energy demand and pricing cycle through high and low points. In 2..