Project Management
Avoid counterproductive project management practices
For many years, reliability-focused engineers have observed flawed procurement processes for mechanical equipment. Many requirements are supposedly aimed at the lowest possible lifecycle cost; however..
Use a schedule confidence tool to manage project risk
On most industrial projects, the baseline schedule completion date and the indicated schedule completion date are typically the same, unless the schedule is forcibly re-baselined. Key learnings have indicated that a reevaluation of the scope, schedule and budget is essential.
HP Project Management: German refinery successfully modernizes safety system
In September 2014, the Heide refinery in Germany used two weeks of planned downtime at its pyrolysis plant to migrate to new safety systems. The new system emphasized high plant/equipment availability..
HP Petrochemicals: Global PE demand growth to drive downstream expansions
According to IHS Chemical, global demand for polyethylene (PE) is expected to increase by more than 25% during the next five years, from approximately 85 million metric tons (metric MMt) in 2014, to m..
HP People
The American Fuel & Petrochemical Manufacturers (AFPM) announced that Brendan Williams has been promoted to executive vice president, effective Jan. 1, 2015. Mr. Williams joined AFPM in 2007 as director of government relations and advanced to become senior vice president of advocacy in 2013.
Motiva halts diesel expansion at top US refinery
“Motiva routinely adjusts our business plans, based on company needs and evolving state and federal regulatory requirements at any given time," a company spokesman said.
BP selects Jacobs as global services supplier for downstream operations
The new contract includes two multi-year regional framework agreements, under which Jacobs is providing engineering, procurement and construction management services as well as personnel on loan at BP’s refinery, petrochemical and terminal sites globally.
Improve execution of capital projects with advanced technologies
The E&C industry is now poised for a major leap forward in utilizing advancements in information technologies and, thus, enabling itself to greatly boost project performance.
Replan: Modernizing Brazil’s largest crude oil refinery
The project included installing two hydrodesulfurization (HDS) units for the cracked naphtha produced by two catalytic cracking units, a coker naphtha hydrotreating (HDT) unit, and a catalytic reforming unit.
3D laser scanning impacts asset lifecycle management
Few technologies have leaped from research lab to everyday use quite as rapidly as 3D laser scanning. Only a few years ago, this technology was a prototype method that captured fuzzy images of plant e..
- Technip Energies awarded two large contracts by BPCL for new units at Bina and Mumbai refineries in India 1/28
- ADNOC and TAQA announce 27-yr utilities agreement with TA’ZIZ, enabling world-scale chemicals production at Ruwais 1/28
- BASF to open global digital hub in India in Q1 2026 1/28
- Solvay inaugurates Europe’s first bio-circular silica facility in Italy 1/28
- Nikkiso’s next-generation marine fuel cryogenic pump skids to support dual-fuel vessel conversions 1/28
- Indian diesel exports to West Africa jump as EU bans Russian crude-derived fuel 1/28

