Kumar, S.
LNG import terminal on a gravity base structure offshore
An alternative design to a land-based facility is a compact, modular construction resting on the seabed
Material selection for low-temperature applications
Analysis shows conventional metallurgy is usually adequate for process upsets
Use extractive distillation to simplify petrochemical processes
Advances in solvent technology enable using extraction methods to separate close boiling point compounds cost-effectively
Simple method determines flow regime for friction factor calculations
Use these criteria to avoid trial-anderror procedures
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- SAMSUNG E&A holds contract ceremony for $354-MM bio plant 3/24
- MOL Chemical Tankers concludes time charter contract for ammonia dual-fuel vessels with CMB.TECH 3/24
- PowerCell secures 2-MW order for M2Power 250 systems in maritime sector 3/24
- Baghdad waste-to-energy project marks a step towards a more sustainable future with SUS ENVIRONMENT support 3/24
- thyssenkrupp Uhde secures landmark contract for GNFC's new nitric acid plant 3/24
- EIA: Jet fuel made up a record share of U.S. refinery output in 2024 3/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction