Kumar, S.
LNG import terminal on a gravity base structure offshore
An alternative design to a land-based facility is a compact, modular construction resting on the seabed
Material selection for low-temperature applications
Analysis shows conventional metallurgy is usually adequate for process upsets
Use extractive distillation to simplify petrochemical processes
Advances in solvent technology enable using extraction methods to separate close boiling point compounds cost-effectively
Simple method determines flow regime for friction factor calculations
Use these criteria to avoid trial-anderror procedures
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Vertex Energy pauses renewable diesel output to switch back to fossil fuels, citing macroeconomic woes 5/10
- Citgo Petroleum reports Q1 profit of $410 MM 5/10
- Golden Pass LNG in discussions with contractor, may delay startup 5/10
- SAFFiRE Renewables biofuel pilot plant to be developed in Kansas 5/10
- EBRD backs Ukraine's green biofuels project with €60-MM loan 5/10
- Russia's refined oil product exports to Singapore to hit highest this year in May 5/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction