Markham, N.
Nathan Markham graduated from the University of Kansas with a BS degree in chemical engineering in May 2009. He works as a Process Safety Engineer for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 teams with NextEra Energy Resources to power Rodeo Renewable Energy Complex with solar facility 12/10
- Global airlines could miss sustainable fuel targets, says IATA 12/10
- INEOS-led Greensand to become first full-scale CO2 storage facility in EU 12/10
- Air Liquide receives EU grant to develop large-scale H2-from-ammonia ENHANCE project 12/10
- Green light for carbon capture and low-carbon power JV projects in Teesside 12/10
- Yara begins production of renewable-based ammonia in Brazil 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction