Moreno, Y.
Yiltzon Moreno is a Process Director in Fluor’s Amsterdam office. He has more than 23 yr of experience in oil and gas operations, front-end engineering and detailed design. He holds a BSc degree in chemical engineering from Zulia University (Venezuela) and a post-graduate specialization in refinery processes from Francisco de Miranda University (Venezuela).
Coke drum and blowdown system overpressure protection design—Part 2
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water.
Coke drum and blowdown system overpressure protection design - Part 1
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
- Mitsubishi Heavy Industries delivers CO2 product compressor package for ExxonMobil’s Wyoming CCS project 10/2
- IMI to supply valves to world’s first net-zero carbon emissions ethylene cracker 10/2
- U.S. crude oil and gasoline inventories rise, distillates fall 10/2
- Germany rejects Italy's proposal for early review for EU combustion engine ban 10/2
- Borouge partners with Inion Pipes Industry to support circular economy with recycled polyolefins 10/2
- IEA: Hydrogen project investments are accelerating but uncertainty remains 10/2