Nair, V.
A scalable mechanical integrity program to accelerate the energy transition—Mobile, visual and dynamic
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ People
/ Americas
As asset integrity and reliability managers, risk-based inspection (RBI) and corrosion analysts, and inspectors and contract inspection firms across asset-intensive industries look to optimize their mechanical integrity programs, there is a paradigm shift to implement a comprehensive, scalable and sustainable fixed-equipment reliability program to meet increasing reliability demands.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Westlake Polyethylene achieves ISCC PLUS Certification at Sulphur, Louisiana (U.S.) site 11/7
- Transition Industries, Mitsubishi Gas Chemical sign PSA for ultra-low carbon methanol 11/7
- Malaysia's used cooking oil exports to face pressure in 2026 on domestic SAF production 11/7
- U.S. EPA approves 14 small refinery biofuel waivers 11/7
- China's October crude oil imports rise 8.2% year-on-year, refinery utilization rates highest of year 11/7
- U.S. urges Europe to stick to oil and gas, not renewables 11/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

