Alqallaf, D. A.
Dalala A. Alqallaf is a Senior Engineer in the Operational Planning division at KNPC’s MAA refinery. She has extensive experience in operational planning and is involved in several studies with separate roles.
Refineries’ pandemic turmoil—KNPC’s gasoline demand: Opportunities and challenges
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Aromatics
/ Catalysts
/ Construction
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Hydrogen
/ Hydrotreating
/ Loss Prevention
/ Management
/ Naphtha
/ Polymers
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Utilities
/ Middle East
The COVID-19 pandemic is regarded as one of the most exceedingly difficult challenges faced in the oil and gas industry's history.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
- CMB.TECH invests in Chinese ammonia supply 12/16
- Petrovietnam, BASF cooperate in developing green methanol, pioneering the energy transition 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

