Carvalho, O.
South America: Argentina
Gas Processing/LNG
/ Petrochemicals
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Alcohols
/ Americas
/ Aromatics
/ Asia/Pacific
/ Biofuels
/ Catalysts
/ Construction
/ Crude oil
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Ethers
/ Europe
/ Gas to liquids (GTL)
/ Gasoline
/ Information Systems
/ Management
/ Middle East
/ Naphtha
/ Polymers
For nine consecutive years (2003–2011), the Argentinean gross domestic product (GDP) continued to increase at an impressive annual rate of 7% to 8%. However, this trend was expected to change in ..
South America: Brazil
Gas Processing/LNG
/ Petrochemicals
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Alcohols
/ Americas
/ Aromatics
/ Asia/Pacific
/ Biofuels
/ Catalysts
/ Construction
/ Crude oil
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Ethers
/ Europe
/ Gas to liquids (GTL)
/ Gasoline
/ Information Systems
/ Management
/ Middle East
/ Naphtha
/ Polymers
Brazil’s economic improvement was remarkable over the past decade, following many years of slow growth. On average, the Brazilian gross output of goods and services increased at an annual average..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

