Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- S-Oil's $7-B Shaheen petrochemical complex is on track for 1H 2026 start 2/17
- SBM Offshore awarded a study by Petrobras for FPSO CO2 carbon capture solution 2/17
- Drone strike hits Chevron, Exxon oil exports via Russia 2/17
- Marine fuel sales at top bunker hub Singapore log soft start to 2025 2/17
- Toyo-Malaysia secures OSBL project to support SAF production facility at Pengerang, Johor, Malaysia 2/14
- TOYO awarded licensing and equipment supply contract for the first ever urea fertilizer plant in Angola 2/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction