Bright, E.
Decrease tube metal temperature in vacuum heaters
Various options for reducing the TMT of a vacuum heater, such as changing the transfer line size and adding extra surface area in the radiation and convection sections, are examined here. The best option generally depends on the limitations under which the heater operates with regard to the process requirements and the downstream equipment limitations and flexibility.
Evaluate challenges in meeting clean-fuel specifications with heavier crude
Process Optimization
/ Refining
/ Americas
/ Aromatics
/ Asia/Pacific
/ Biofuels
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Engineering & Design
/ Equipment
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Information Systems
/ Management
/ Middle East
/ Octane
/ Reactors
At a Saudi Aramco refinery, a revamp was planned for processing a different crude oil blend to meet Euro 5 diesel and gasoline specifications. The refinery, which processes semi-light crude oil, is sc..
Debottleneck crude-unit preheat exchanger network inefficiencies
Simulation models can be effectively used to optimize heat transfer and boost operational performance
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Michelin, IFPEN and Axens announce successful progress in BioButterflyâ„¢ R&D project to produce biobased butadiene from bioethanol 12/11
- UPM launches the first bio-based, NIR-detectable, carbon-negative pigment for premium packaging 12/11
- Five mega-trends reshaping the global energy and resources landscape in 2025 12/11
- RCI, nova-Institut unveil new carbon label for products, intermediates and raw materials 12/11
- SK Energy secures in-house access to feedstock to create Korea's first vertical integration for waste plastics recycling 12/11
- Petronet LNG secures loan for 750,000-tpy PDH/PP project in India 12/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

