Engineering & Design
ATOME announces FID for $665-MM green hydrogen project in Paraguay
Construction of the plant is expected shortly following FID with full production projected to commence by or before October 2029.
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Acetyls and Sandpiper Chemicals announce $1.7-B, 1.1-MMtpy low-carbon methanol project in Texas (U.S.) 4/29
- Envision joins AEA Ammonia Certification System pilot to accelerate global clean ammonia trade 4/29
- BASF and Nutrien collaborate on expanding access to low-carbon biofuel markets 4/29
- India proposes rules to allow higher ethanol-blended fuels in vehicles 4/29
- Indian refiners' March crude processing slips 1.8% from a year earlier 4/29
- Sinopec refinery utilization drops, but chemical exports rise due to Iran war 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

