Process Optimization
Dow picks Fluor for engineering on planned Texas ethane cracker, PDH unit
Fluor’s scope includes the engineering, procurement and construction of a propane dehydrogenation unit, an ethane cracker, and associated power, utilities and infrastructure facility upgrades to support each unit. The facilities will be built at Dow's Oyster Creek facility in Freeport, Texas.
Avoid hidden costs of suction-specific speed in pumping
More than 30 years ago, a landmark study observed a relationship between suction-specific speed and the probability of pump failure that changed the way pumps are selected. This observation created th..
Rerating rotating equipment optimizes olefins plant performance
Rerating your installed compressors and steam turbines can become a cost-effective, time-saving solution for increasing throughput without having to invest in new equipment.
Investigate power limitations in a large steam turbine
An investigation was carried out to rectify power limitations for a steam-turbine driver of a cracked-gas compressor (CGC) in a world-class ethylene plant.DescriptionThe turbine is a nine-stage, impul..
Seal safety may require going beyond typical standards
Top industry professionals believe users must reach beyond typical standards in applying safer mechanical seals when hazardous and toxic chemicals are involved.
Consider both actual and virtual spare parts inventory
Globally, hydrocarbon processing industry (HPI) facilities operate hundreds of thousands of fluid machinery assets. The various service-specific internal components of these assets are supported by ma..
Consider novel CGC and front-end depropanizer system for olefins production
In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.
Enhance operation and reliability of dividing-wall columns
Dividing wall columns (DWCs) are an attractive option when the goals are to reduce energy consumption and capital investment for distillation processes. A major component in a DWC system is the reflux..
Optimize vacuum ejector operations
Vacuum distillation unit (VDU) designs generally involve jet ejectors due to their low capital and operating expenses, high reliability, durability and simplicity. Once the ejector is installed and co..
Flare header failure: An investigation
A 60-in. flare header suffered three identical failures with buckling and cracking at the circumferential weld at the bottom of the pipe. The failures are believed to have originated during hot relief..
- XRG acquires upstream stake in Vaca Muerta to support the Argentina LNG project 6/29
- Baker Hughes extends long-term service agreement with Nigeria LNG to support critical expansion project 6/29
- Technip Energies, Alterra and Neste launch Nerea, a standardized modular solution for plastic chemical recycling 6/29
- KBR technology selected for 100,000-tpy ethanol-to-jet SAF plant in Singapore 6/29
- Acelen to license Alfa Laval's HVO pre-treatment technology for Brazilian biorefinery 6/29
- Mitsubishi Gas Chemical and Gold Hydrogen sign MoU to assess green methanol production in Australia 6/29

