Laturkar, K.
Kaustubh Laturkar works as an Engineer at the Facility for Rare Isotope Beams, a U.S. Department of Energy (DOE) project in Michigan. He has more than 9 yr of experience working in the field of process engineering, refinery operations, utility systems design and operation, with a special focus on design and commissioning of engineering systems. Laturkar earned an MS degree in chemical engineering from University of Florida and a BE degree in chemical engineering from Panjab University, Chandigarh, India. The author can be reached at kos19188@gmail.com.
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- U.S. diesel exports to ARA set to rise on scarce European supply, firm US production 12/6
- Russian petrochemicals giant Sibur plans IPO in coming months 12/6
- Phillips 66 and United Airlines sign SAF supply agreement 12/6
- Varo Energy in talks to buy Preem's Swedish refineries 12/6
- Biden administration will not finalize clean fuel tax credit guidance 12/6
- Petroleum Economist’s Paul Hickin recognized among the 50 voices in commodities worth following 12/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction