Gas Processing/LNG
Automation Strategies: Expanding scope of automation events and alerts
Detecting, reporting and responding to abnormal situations or events are important functional elements of a complete process automation strategy.
Reliability: Technology transfer training is most effective for small groups
Training can take many different forms.
Petrotechnics’ survey reveals reality of risk in the global hydrocarbon industry
ABERDEEN, Scotland, UK — Petrotechnics, the developer of the hazardous industries’ first software platform for operational excellence, has released its 2017 Operational Risk and Process Safety Management survey results. Insights from more than 200 senior industry leaders reveal that only 6% believe their companies are fully up-to-date with their scheduled safety-critical maintenance.
Taiwan suspends oil exports to North Korea, imports of clothing
TAIPEI (Reuters) — Taiwan has suspended refined oil and LNG exports to North Korea, as well as clothing and textile imports, to comply with United Nations resolutions, a largely symbolic move by the island to show it is a responsible member of the international community.
Upgrade the ALARP model as a holistic approach to project risk and decision management
The ALARP (as low as reasonably practicable) model was developed by the UK Health and Safety Executive to establish and justify risk acceptability limits.
Boxscore Construction Analysis: The state of the global downstream construction sector
In May, Lee Nichols, Editor and Associate Publisher of <i>Hydrocarbon Processing</i> and <i>Gas Processing</i>, presented a detailed, year-to-date trend analysis and review on new and active downstream construction projects around the world.
People
Dr. Béla Kelemen has been named President of the European Petroleum Refiners Association for the next 2-yr term.
Global Project Data
<i>Hydrocarbon Processing’s</i> Construction Boxscore Database is tracking nearly 350 downstream projects with capital expenditures (CAPEX) of $1 B or greater.
Reliability: Identify top ways to weather weak market conditions
New Jersey-based Carmagen Engineering Inc., a member of Mistras Group Inc., is a highly respected consulting engineering and project management firm comprising experienced subject matter experts (SMEs).
Saudi Aramco to complete phase 1 of expanded gas pipeline by year end
KHOBAR, Saudi Arabia (Reuters) — Saudi Aramco will complete the first phase of an expansion of the main gas pipeline across Saudi Arabia by the end of this year, the company said in its weekly magazine, part of an effort to meet the kingdom's rising gas demand.
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4

